Welcome to www.victory-light.com
TEL: +86(791)-88632902
 

600MW - Turbine Overhaul - Flow Modification

Project Overview:

In order to improve Turbine efficiency and save fuel consumption, and at the same time, to increase steam extraction volume (Flow Modification) by regulating steam valves, inlet nozzles,  and by modifying size and locations of fixed blades, guide blades, extraction opening as well as rotating separators